Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 1841

Query of routing with change number

$
0
0

Dear,

 

I'm trying to create a query (SQVI t-code) about routings, currently, we use the change number for to plan changes (when is necessary), however, this is a problem when I go to create a query:

 

 

 

Only see, the routing of a material is bellow, with six operations valid:

Roteiro atual.jpg

 

At the query, I do a selection, for to clean the invalid operations (not select PLAS-LOEKZ = "X")

PLAS table.jpg

At the PLPO table, I have two logs for the operation number 0050, one is valid and the other not.

PLPO table.jpg

Query result:

Query.jpg

I thought in the possibility of the use a filter the log for date (larger that the actual date), but, this condition, the operations number 0010, 0020, 0030, etc, do not appear.

 

Someone know how I can do for get select only the logs valid?

 

Or if to include some field at selection, or some like this?

 

Thank you very much in advance

 

 

Best regards,

José Dallagnese


Viewing all articles
Browse latest Browse all 1841

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>