We currently have 2 boms for making a particular HALB, the only difference in the 2 boms is a few significant materials.
How do I get SAP to alternate these two versions in planning?
We use Production Versions but there are no differences in lot size, or validity dates on these two alternates so the system is always going to look at the first PV, never planning for the materials in the second.
Suggestions?