Hi all,
Please guide me with this issue, I have PP with QM activated for a Fini Material, by error PP confirmed wrong quantity into CO11N, then QM gave Usage Decision with same error, then we did should go via MB31 mov 102 to reverse stock and everything was OK, into Production Order we got zero for all materials, but not for time-sheet (activity types), so we went via CO13 to cancel these, but the tcode does not work since there are not stock anymore.
Remark, when we tried to go first via CO13 before MB31, we received message about the cancellation is not possible due to inspection lot has been posted.
Please help, it is really a urgent matter due to we are facing the end month.
Regards
OP