Issue storage location in production order
Hi PP experts, There are two components in a production order, both component are not backflush material. And both material's storage location in BOM are not maintained. The first material:...
View ArticleScheduling based on WIP Quantity
Dear experts, I would like to know if there's a way to enter a scheduling formula in the work center, based on the WIP Quantity ? For example, we have two work centers and between this, a WIP...
View Articlebom creation scenario?
hi experts,here is my scenario i have an order which runs throught the year i requirement is only one material is needed through out the order and orther materials are needed in some cases. what should...
View ArticleFinal Assembly with no. of Sub Assemblies
Hi Experts, Here i have a different scenario, i.e. I have Kit BOM - It consists of number of sub assemblies in one box. I'll be getting forecast for Kit BOM level from customer. I'll run MRP for Kit...
View Articleno message logs in cohv
In mass processing transaction- COHV, when I try to do the TECO for production orders. I get the prompt There are processing records and the order cannot be technically complete. In the prompt, when I...
View ArticleRegarding Change IN BOM and Routing With ECM
Hi All, Need to develop Z-Report for fetching BOM and Routing changes done by change no. I have used BOM FM ----CS_BOM_EXPL_MAT_V2 for Routing below logic is used... In case of routing we using same...
View ArticleHow to compare factory calendar through OY19 t.code
Hi Friends, As per the business requirement i have to compare multiple factory/Holiday calendars from Production land scape to Golden client .there is one t.code OY19 to compare these two...
View ArticleCOHVPI job problem
HI All, We currently having a problem with COHVPI job for mass ATP check process orders.But this job fails every other day due to lock entries of process orders.Because of this all the other orders...
View ArticleCOGI Error with a Neg value: IMSEG-ERFMG is negative. Only positive values...
We are in ECC 6.0 and still getting this error.! Usually BOM has a +ve value and with shortage of that quanity , COGI shows up with a +ve value ( Mvt type: 261-Consumption). In this case, the COGI is...
View Articledifferent shifts for one capacity type in one work center
Hi gurus! I have a problem with an avalible capacity of Work Center.In my case I have 2 groups of piople which are the one Work Center.caseOne have a shift 5 days (from 9 am to 6 pm) a week, another...
View ArticleLSMW For BOM WITH TWO FLAT FILES (header & item).
Hi: I'm working with LSMW @ specify files i got the following error : LOGICAL FILE "ZFILE1" IS NOT ASSIGNED WITH PHYSICAL FILE "CS01_CS01_CS01.lsmw.conv" OS IS "WINDOWS". Pls help to fill the field in...
View ArticleProduction Confirmation with Base UoM & Alternative UoM
Hi Experts, We are working in an FMCG Industry which is very weight intensive in nature and therefore we are stuck in a business scenario which is very critical for business. I would request any...
View ArticleAbout Production supply area in KANBAN
Hi Gurus,One of my client is having below requirement in KANBAN.Change of Production supply area , Bins, in existing control cycle without deleting the control cycle.I havent worked in KANBAN before....
View ArticleComponent already withdrawn error
Hi, While trying to change batch number of one component I am getting error component already withdrawn. scenario is process order is released, TR, TO , confirmed but no 261 movement done. i want to...
View ArticlePrice Issue of Subcontracting material
Dear SAP Experts, I a m facing an rissue. When we un cost estimation for a particular material of Subcontracting, system is taking old PO in cost estimation run through t-code ck11n. We have created...
View ArticleSplit Valuation
Hi, We have a company with 2 plants. a product A which is produced in plant -1 But the same is received from our plant-2 as a raw material . Behavior of product A In Plant-1--- Raw material &...
View ArticleBOM Not Exploding With SPK 40
Hello Experts,My client is a manufacturer of gears and most of his business is running on subcontracting.Suppose they have two plants i.e Plant A and Plant B in which there are some materials in the...
View Articleuser-defined field in routing - define formulas
Hello,I created a new field-key "ZEGSTON" with user-defined fields:In routing I added values to diffrent fields:In customizing I created a new parameter "ZFAK01" using option "4".In customizing I...
View ArticleMake-to-order MRP Run
After MRP run in MTO scenario, the end user makes some changes in the BOM.My question is 1) Can he rerun the MRP?2) Does it effect anywhere? 3) Is it advisable to rerun MRP as many times as possible?...
View ArticleLSMW for Routing : Production
Hi, I'm using LSMW to create a basic routing i.e., a header material with 3 operations. Nothing more, I have attached the step wise screen shots for references. Issues: 01. In Maintain Field...
View Article