sap operation rework after confirmation

HI,expertsIn our scenario,there are four operations  assue order quantity-100production order operaion as blow,operation num                              control key        Operation Quantity...

View Article


PI Sheets....!!

Hello Experts,I have a requirement from  Pharma client to implement PI sheets,I am working from last few days on it and trying to build up concept of this functionality provided by SAP.I have already...

View Article


Same Operation Number create with same operation.?

Hi..!! Gurus It can be possible to add same operation with same operation number for creating Production Order Number.?if this is possible so give me answer with all steps.. thanks..

View Article

t-code for work in process

hello is there transaction for work in process orders?

View Article

CO15

Hi,GurusCurrently my client is performing (with no issues whatsoever) production order confirmations via CO15.But now there is a business need to include extra inputs in the PO confirmations (like...

View Article


Batch in process order

Hello Experts, We have a few materials for which the batch management is activated in the material master level.But the batch is not displayed at the order level.Please refer to the attached...

View Article

Assigning Intermediate operations in Routing with select Qty than Production...

Hi,We have a scenario of assigning Intermediate operations with selected quantity in Production Orders. Production order is released for 100 numbers. After release of Production Order Shop floor...

View Article

BOM ALEKZ INDICATOR ISSUES

Hello friends,  We create and update the material and BOM in sap via ALE transfer the data from a PDM interface to the ERP system SAP. When the transfer is done the ALE indicator is active so future...

View Article


CEWB

Hi Is it possible to run CEWB in background? I'm changing 20k BOMs and it really takes time milk

View Article


MRP BADI MD_MODIFY_PRODVERS can't be called

Hi experts, I know the BADI MD_MODIFY_PRODVERS is not valid in ecc6.0, but I still need to change the production version for subcontracting. I need to change production version according to the...

View Article

PRT Materials Availability checks in Production order creation time

Dear PP Expert,                 I have created PRT under Material category, and assigned to the PP Routing.PRT Material Number = xPRT Material Quantity = 1Production Order created Material = A...

View Article

Process Order Quantity

Hi Guru's, I am facing an issue in Process Order Confirmation where an Process Order of 100 Qty is created and partially confirmed with 50 qty and GR of 50 qty is done.But When i am trying to confirm...

View Article

MC88 - Message no. MA300 - No resource load exists

Dear All, I am facing a problem in MC88 while i click on views > Capacity situation > Rough cut planning > Show.It is showing the msg as Message no. MA300 - No resource load exists for only...

View Article


How we get manufacturing date popup for partial confirmation

Hi Experts, We have MTO scenario where we maintained Z table for calculation for shelf life calculationWhen we do GR for process order ,we enter manufacturing date in popup which is automatically  up...

View Article

No movement type 531 happening automatically for returnable byproduct in...

Hi SAP Gurus, We have created a new plant. While processing the process order, when we were taking unplanned goods issue for returnable items, only mvmt type 261 is happening and no movement type 531...

View Article


Image may be NSFW.
Clik here to view.

Batch searching procedure by Batch creation date in FIFO basis

Sir, My Client asked me to do a batch searching procedure by batch creation date at time of material consumption in COR6 . I have tried to do so but  I am getting error. I just posting a demo scenario...

View Article

How to firm the planned orders for mrp type p3

Hi Please guide me in firming the planned orders for MRP type p3. I have tried firming by setting the manual firming date but after the next MRP run the planned orders are again pushed out of planning...

View Article


SOME MATERIALS ARE NOT INCLUDED IN THE MRP JOB RUN

Hi, In our plant X there are 100 materials (of MRP type p3 )for which MRP job run everyday. But recently what we have observed is some materials are not included for the MRP runs for some days because...

View Article

Strategy 50 - Qty Reduction not happening in VP type Planned Order.

Hi, The following example is as same as my requirement. But Planned Order type VP doesn't reduce its qty in next MRP Run as underlined in the e.g., Strategy : 50 , Ind / Coll : 2. Consumption Indicator...

View Article

Image may be NSFW.
Clik here to view.

No product costing estimate could be found,Message no. KE380

Hi, When i am going to release  The Document from VF02 To accounting section ,I am getting this error,How to release this Document Could you please help on this. DiagnosisIn Profitability Analysis...

View Article