Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 1841 articles
Browse latest View live

Which table to refer routing opration activity Time in SAP PP

Business uses transaction (Customize) to review actual operation confirmation times. This is the actual time the employee has spent on that particular operation and activity. The business is requesting...

View Article


Message number for "No valid BOm exist for material xxx"

Dear All,We are using ECN for creating and change number. Sometimes we observe that BOM is created but same not being approved in System.In this case Production is posted without BOM.Screen shot is...

View Article


rework order confirmation

Hi,experts Original production order confirmation trigger point the rework production order (without material).When i confirm the rework order,and in FCOST i confirm the yield ,the production order...

View Article

Production order printout not in sequence of production number instead print...

Hello PP Experts ,  On Unicode upgrade we are receiving issue related to Production order printout not following the sequence of production number  instead its printing according to sequence of...

View Article

Batch Determination

Hi All, Can anyone please tell me what all stock types (Unrestricted, restricted etc.) are considered during batch determination for component material in Process order? (Or if there is any settings or...

View Article


planned order not getting converted into notional production order (FBDD type...

dear sir        i could not able to convert  planned order into notional production order as the item is direct despatch item should be despatched from stores without any shop work. attached error...

View Article

Change BOM using Change Documents - different rules for same material type

Dear, We have two materials (material 1 and material 2) code for same product type and we would like to change it using the transaction code CS02 and: For material 1: The system shows us the message...

View Article

Scheduling in a Work Center

Hello, I have a question dealing with scheduling inside a work center. The work center that I am dealing with is our testing work center, it should only show up in our capacity during the second week...

View Article


BADI WORKORDER_REWORK -get rework order yield

Hi,expertsDuring implementing the BAdi WORKORDER_REWORK method GET_REWORKED_QUANTITY,which the parameters should be updated?I don't understand the logic of updating,fox example , the yield of  rework...

View Article


Image may be NSFW.
Clik here to view.

BOM Change Document.

Hi Experts, One of our user made some changes in bom by using TCode CS02. now i am trying to find what are the changes he has made on it?. i found the concern persons EID and change document no in...

View Article

Goods Movement Issue

Hello experts, We have an issue with a process order 7000148145 which is already in confirmed status.But the goods movement display of the process order does not show the 101 movement for the header...

View Article

Image may be NSFW.
Clik here to view.

Migrated flavours are not working in personas 3.0

Hi All, Great day to all of you.. we are in to Personas 3.0 version now.. so the flavours which we have created are migrating from Personas 2.0 To Personas 3.0 after migrating all flavours are showing...

View Article

Image may be NSFW.
Clik here to view.

Wrong Issued Value Quantity In MCRE Report

Dear PP Gurus, As per below screen shots wrong values display in MCRE/MCRX  Report   I have Check all movement types in MB51 but Values are not match Also Check OMOD, Material Price & Required...

View Article


Display of planned order in Production units

Hi Guru's We have finished goods which are stored in PC (Piece). The production unit is CAR (Cartons). I each Carton there are x-number of pieces.Th requirement is in CAR and the production order is in...

View Article

External production order

Dear PP gurus, Could you please help me to find out a solution to manage the following scenario through Standard : I want to track a subcontractor activity without using the standard subcontracting...

View Article


Backdated PR for phantom BOM's components.

Dear Sir, My scenario is as follow. Production order of finished good ABCD is created on 10.11.2015. BOM is created for AB on 23.11.2015 & updated in Production order on 23.11.2015 with explosion...

View Article

quantity not getting increased in general page

in production order i changed quantity from 7 to 2 in general page. later when i am changing back to 7 it is not taking error attached. kindly help.

View Article


Error on Activity Backflush in Repetitive Manufacturing Confirmation (MFBF) :...

Hello, I am new to Production Planning and to SAP. While doing a repetitive manufacturing confirmation with an activity backflush, I get the error "Network does not exist" while saving the activity...

View Article

Auto update of final Issue Indicator

Hi experts, In current process we have multiple options through which I can tick the final Issue Indicator in component overview of production order. Directly through CO02 component overview- This...

View Article

Movement type 261 and automatic recalculation of withdrawn and reserved quantity

Hello, is there a setting in customizing or somewhere else, which leads a sap ecc backend to recalculate withdrawn quantity and reserved quantity automatically, if it receives a 261 movement for a...

View Article
Browsing all 1841 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>