Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 1841 articles
Browse latest View live

Contract with item category consignment

I have created a contract type ZRA with item category consignment.  With checking table A016, it's impossible to display condition record number .Why with consignment flow , condition record number...

View Article


CONTROL RECIPE NOT GENERATED

Hi,We have one issue where control recipe  was not generated and the error message shows that "No values assigned to char. 0520 PPPI_ACCEPT_INVALID_INPUT in process instruction 0000 phase 0011I have...

View Article


capacity dispatch from one work center to another

Dear SAP Expert, I have query regarding capacity planning after searching from SCN and google. I want to dispatach capacity from one work center to othe. I have maintained all parameters like...

View Article

Serial Number Vs batch management

Dear Team, I understand that both batch management and serial number is used for material tracking purpose. Could anyone explain me in which business scenario batch will be used and what business case...

View Article

Image may be NSFW.
Clik here to view.

confirmation error in collective order

dear all, Am testing collective order process,while testing am getting  below error in confirmation . Please help me to solve this issue.     regards,bharath

View Article


Copy routing to another plant

Hello,I am trying to copy routing from one plant to another manually, entered all data correctly when I press enter at copy from screen system shows message that "No task list found" so I am not able...

View Article

Image may be NSFW.
Clik here to view.

Default Value - Item Category "L" in CO01

Dear Sir, Pls see the below screen shot.  In my case, the Production Order Header material do not have constant BOM. Each time when i create a production order, i have to enter the BOM Component...

View Article

BAPI for Creating Production Order With BOM Component.

Hi, For a business requirement, we created a production order with BAPI_PRODORD_CREATE. I want a to know thorugh which BAPI program, i can create a production order with BOM Components details. Thanks...

View Article


Image may be NSFW.
Clik here to view.

SAP PP-PI Enhancement for automatic capacity leveling ?

Hello SAP Gurus, did you have in a project develop an Enhancement for automatic capacity leveling ?  Basic CM07 or CM25 doest cover the need and we don't want to implement and APS solution  my client...

View Article


MC9A not generate planning Hierarchy for new infostructures(MC9A)

Hi GurusI created new info structure Sxxx for characteristics material group, sold to party and partner. Key figures are confirmed quantity and target quantity.I followed all the steps and...

View Article

system assigns the existing serial number to a production order

Hi, Serial numbers are generated during production order release. But now system is assigning the serial number which is used on previous order.This behaviour started recently, Please suggest. Thanks

View Article

PP-SD integration

Hi All,   I have a scenario:One Hollow screw part needs to be sold with some packing materials.I need to track the quantity and cost of packing materials.Apart from that the problem is this hollow...

View Article

Capacity planning not possible on Friday evening shift

Hello Gurus,I am planning using CM25. The system allows to plan for the whole weekexcept the last shift of the week i.e.. Friday evening 19:00 to 24:00,it does not allow the starting of the order in...

View Article


Production Order status

Do anyone knows the T-Code for see the order status directly. I need to see, where the production order exists (last CO11 confirmed step) of multiple orders same table and get the exported list....

View Article

Image may be NSFW.
Clik here to view.

Serial Number with equipment master

Dear Team, I have configured serial number profile in OIS2 as below. Based on the below settings, I understand that the equipment master will be created & I can view the equipment details in IE03...

View Article


Material staging

Gurus,I am doing material staging for production order with PP-WM interface.When i am doing WM staging,if the stock available the staging is happening but when there is shortage of stock,the WM staging...

View Article

Image may be NSFW.
Clik here to view.

Serial Number - Number Range

Dear Team, I am listing the serial number details in IQ03 as below. The serial numbers are listed as 1, 2, 3,.........23 etc.  I am checking in SNRO for the object /EACC/SERI, I did not maintain any...

View Article


OPJK availblity Check

HI Experts, In OPJK i used relese material 3 [No release if parts are missing] but while am releseing production order if material not availble also production order released. Please help me out on...

View Article

MRP - External operation - component allocation

Hello,We have routings with 2 operations. the first operation is an external operation and the components are allocated to this operation.After the MRP run, planned orders are created but the external...

View Article

Image may be NSFW.
Clik here to view.

Where is Data that automatically populates a PI-Sheet stored?

There is information / data that appears to be hard wired somewhere behind the scenes of our PI-Sheets. I did not build the Master Data info pictured below into the PI Sheet, and the data does  not...

View Article
Browsing all 1841 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>