MRP not consider transfer post vendor stock

During material transfer process, we create a MIGO transfer post to move material from special stock Q (projeto) into R (transfer post - vendor stock). Then we run MRP and material is no longer seen as...

View Article


Impact when Selecting Incorrect Process Order Type

Dear Expert,Our scenario is the following:Material 1 linked to Prod. Sched. Profile 1 and Order type 1. Material 2 linked to Prod Sched. Profile 2 and Order  type 2.  (no good receipts for this order...

View Article


Image may be NSFW.
Clik here to view.

Procurement type - X

Hi Gurus,  I have maintained the procurement type X for a material xxx.  I run MRP with Create purchase requisition mode as 1 (ie Purchase requisition). but planned order is created in MD04 .   Is it...

View Article

UOm not rounding up to 1 after implement of OSS note 359621

Hi Friends, I need help on one issue. I had issue of rounding the fraction qty of component during GI-261 movt type. I mean when for Production order I issue the quantity for component with discrete...

View Article

Image may be NSFW.
Clik here to view.

Delivered field qty issue in production order general tab against MB51 and MD04

Hi,I am facing one issue in production order delevered field in general tab is showing the qty as 7.590 out of total qty 11. 000 But in mb51 the material Documents for 101 movements is showing for...

View Article


GI and GR needs same batch number

Hi All, in my project I am having one SFG & one FG. After SFG manufacturing, same is moving for packaging and again we are creating a new PO for FG material. My requirement is to derive SFG batch...

View Article

Change Supply Area

Hello,  I have an issue and I hope someone can help me with it. So I need to set up all of the components required to build product to PROD-02 Supply Area and the production orders to grab all...

View Article

Using Pk23 entered delivery date 15 days later but planned date differs

Hello Expert's I am creating Kanban pk23 and I entered date 15 days later from date of creation Kanban.But in TO /TR in display mode it is showing planned date of tommrow How?I also changed planed...

View Article


Production Order affect in changing the BOM?

Hi Friends,Good Day...1. If i created a Production Order on 01-Feb-2015, whatever the BOM having the parent assy is as it is and in 03-Feb-2015 if i change an BOM in parent assy what will be the effect...

View Article


Production order releasing

Hi experts, I have a scenario where the production order should not be released when there are missing parts. I have already set up it in OPKJ and it is working. However, the production supervisor...

View Article

MD 11 Planned order scheduling

Hi  When i create planned order with MD 11 and put basic end date as 11.03.2016  ( Today's date) and press scheduling  then  planned order is scheduled to  give basic start and production start dates...

View Article

HAVING ISSUE WITH WRONGLY MADE PROCESS ORDER TYPE

I am facing issue with a process order 1833570 as this process order was made mistakenly with type ZPIM instead OF ZPI2. So what happen - after giving pallet transfer ,shipping confirm it but it became...

View Article

Production Process for Subcontracting Service

Hi Please Help me to find a solution for the below scenario. Client has two Company codes . both company codes manufacture customized adhesive  tapes.  1. company "A" subcontract semi-finished...

View Article


Date of Manufacture, SLED/BBD

Hi friends, we assign Date of Manufacture as manufacturing date and SLED/BBD as Expire date for our products. We manufacture our FG using 2 level or 3 level SFG. Our requirement is date of release of...

View Article

Planed order not generated after MRP run

why after MRP run planned order is not generated ? I saw various other threads where the suggestion of changing the strategy from 10 to 11 , In mrp run change the planning mode to 3  etc seen. But...

View Article


Mass confirmatiom production orders

Hello, everybody. I have two quastions:1. When I do mass confirmation using tr.COHV system put current date in goods receipt. But I want to confirm production orders with date in the past. Is it...

View Article

Converting planned order to production order

HI All, While converting the planned order to production order , the costing relevancy X is not getting checked in production order component details. Even though the costing relevancy X is there in...

View Article


Strategy 50 with account assignment E vs M

Hi Gurus,  First of all I would like to mention that in one of the older sap systems I was not able to find account assignment catgeory M - Ind Cust w/o KD-CO and requirement class 045 has E as the...

View Article

lsmw

Hi,can  any one you  please explain the how we can do the lsmw for co-products, is there any templates for co-products for lsmw. Regards,Sree.

View Article

Error Message: IWO_BAPI184

Hello expert,       I setup a new function to mass add material into production orders and I call the bapi: BAPI_ALM_ORDER_MAINTAIN.       When I upload the material by template, system send me a error...