Appropriate Planning Time Fences for Multi-level Assemblies

Seeking input on setting Planning Time Fences for complex assemblies with multiple sellable levels. For example... Product StructureLowest level: 1A1Mid-level: 1A1 goes into 2A2, 2B2, and 2C2Top level:...

View Article


MRP to exclude requirements within planned delivery time or replenishment...

Hi Team, Do we have a MRP type that would exclude the requirements for a material within its planned delivery time or replenishment lead time. We would like to create a seperate requisiton for these...

View Article


Requirement PBED

Guys we use fiscal calendar .Our calendar starts in April.Currently we are in 06/2016 period. I was trying to see the requirement of last three periods ( 032016,4/2016,05/2016)  in PBED table but don't...

View Article

Error in COOIS: Order maybe in use; please try again later

Hi Experts, Will appreciate your thoughts in this. When the user is trying to perform change in orders via COOIS transaction and save, he is receiving the error message: "Order may be in use; please...

View Article

Lead order confirmation problem in collective order

Dear Expert,      I have a order confirmation problem in collective order. Let me have an example to explain the problem:      Finished product:                 FERT,      Finished product's routing:...

View Article


User Exit in MD01 SAP PP

Dear All,In current system, we’ve done user exit in MD01 transaction for MRP run at following levels:1.     MRP Controller2.     MRP Type3.     Planning Strategy Pls note that MRP run with these user...

View Article

Tcodes for the functions in OPPQ.

Hi : The following activities are defined via OPPQ - Define Plant Parameter for MRP. I assume that OPPQ is tcode where we can access function of several tcodes i.e., Collection of Tcodes. For. E.g.,...

View Article

SAP OEE

Hi,  SAP Overall Equipment Effectiveness Management (SAP OEE Management). 1.     Is this a sub-module in SAP PP or Separate Module.2.     If separate module, what is the EXAM Code and What are SCN...

View Article


SAP Raw Material Scrap tracking to Production Order

Hi,  Currently we are doing manual 551 when we scrap Raw materials during the production order execution and adding a text with the order number. I want to explore possibilities of tying this scrap to...

View Article


Mass Processing for MC88 with Info Structure S076

Hello Experts, I am having a problem to execute MC88 in mass processing. The scenario is COPA is sending the plan quantity and which comes in Sales Row of the S076 structure (in MC88) and next step is...

View Article

Default value for period indicator MARC PERKZ in material master (mrp3)

Hi gurus,when creating a new material master, the system automatically compiles the period indicator field with "W" (MARC-PERKZ in MRP3 view).I want to change it to "T". Can anyone explain me how the...

View Article

Image may be NSFW.
Clik here to view.

Dump ERROR-Collective Order

HI experts, I faced a very strange incident, the collective parent production order 102387635 has something wrong, and it can’t display the sub-level production orders.So user want to TECO this...

View Article

Grouping Similar Operations

Production Order No. “01”Material : XRouting :Operation – 1Operation – 2Operation – 3Operation – 4Operation – 5 (Setting Time : 240 Mins & Tear Down Time : 90 Mins)Operation – 6Production Order No....

View Article


Batch field disabled in MFBF - Post with Correction Screen

Hi All, We are using ECC 6.0 and are into EHP7. We are following Repetitive Manufacturing for our Production Process. It is observed that in MFBF - Post With Correction option, the Batch field is...

View Article

Batch Derivation

Hi Everyone, In our project there are many production order types. For one production order type I have to active batch derivation. is it possible to active batch derivation for one order type. ? If...

View Article


Work Center different statuses and operations

Hi, How can you check/assign the status to a work center. I need to do this in order to efficiently schedule planned orders. e.g.: I have a cylinder boring machine that can drill big and small holes,...

View Article

ATP change avalaibility check data

Dear gurus, i need to change avalability check for some component during ATP check of planned order or production order. For example i have "02" in MARC-MTVFP ( avalability check)  and during ATP check...

View Article


How to design process order in this scenario?

Hi Experts, I have to design process order for Inventory adjustment (PIIA)...Raw materials and for packaged goods. Can you please suggest how to proceed in this scenario?

View Article

MRP - Capacity check at planned order level

In our system, currently MRP doesn't do capacity check at planned order level.  Example; On Sept-30 we have requirement of 100,000 KG and planned order fixed lot size is 10,000 KG. Work center capacity...

View Article

SAP Standard PP

Hi SAP PP experts,  I am new to SAP PP.  I want to perfect my SAP PP knowledge, but right now I have assigned the client who is using total Z development. So I am not in touch in standard SAP PP....

View Article