MRP Element data MD04
can anyone explain when ***/STCK comes in MD04 for planned order and when ****/RS (this i guess when planned order generate from PIR through MRP)
View ArticleOverall Yeld on planned orders
Good Evening everyone, I am looking for a way to take into account production yeld on planned quantities in SAP for a manufacturing process with multilevel BOMs. MRP1 view contains the % of assembly...
View ArticleMRP Planning special scenario at sub-assembly level
We have a scenario where, we want to use the "Demand" (MD61) for a subassembly component and plan components below it. However don'tneed the sales orderfrom the FG to plan the subassembly component. I...
View ArticleIs it possible to block stock at production confirmation?
Dear All, I have the following requirement.When I confirm production (at CO11N) is it possible for my finished product to be automatically blocked? Thanks guys
View ArticleCOR1 Batch Number in Goods receipt tab
Hello All, In quality server while creating process order using COR1 and when they go to goods receipt tab, in batch field, its picking the correct batch number exactly from the sequence...
View ArticleCO11N - Wrong Posting Date passed to the Mat. Doc
Hi, We are having some trouble on confirmation while defining the Posting date as a past date in CO11N. In some of the Confirmations, when i check the confirmation detail in CO14, i see that posting...
View ArticleNegative Stocks in AFS MRP.
Hi Can i know the reason why AFS MRP does not consider the By-Products in Sub contracting scenario.But, Manually created Purchase Orders for AFS Materials the Sub Contacting scenario is working fine....
View ArticleIn level-by-level planning, how can I get the single product group field?
Hello, I am doing level by level planning of product group, but I am getting two parallel fields of same product group in characteristics.And when check with planning type SOPDIS, I am getting only one...
View ArticleUsage Probability in phantom components
Hello All, We are using 'Alternative items' in BOM. Out of those items, some are 'Phantom items'. Now, when we are checking production order, for the components which we have maintained as 'Alternative...
View ArticleSARA error
Hi,When I try to Create the archive file for deleting process orders, the system displays the following error. Variant view: Thank you. Regards. OCS
View ArticleError determining planning periods for Calender -MD04
Hi Experts,I recently(yesterday) changed factory calendar on client request as they had shut down for two weeks. After MRP run today morning when we are trying to go to a material its throwing error as...
View ArticleCK11n article w/t cost comp split error.
Dear Friends, We are getting error while executing the costing run due to all article prices is zero as a Non –valuated material. Clients want to capture only the Activity costing for the process...
View ArticleError determining planning periods for calendar
When the user does Single item single level MRP, he receives error " Error determining planning periods for calendar ".parameters: 1,3,1,3,2. Planning calendar is valid until 12/29/2016. Can you please...
View ArticleCK11n water activity price is captured which is not maintained in recipe.
Dear Friends, We are not maintained in water activity cost+ in particular process, but system captured the water price in ck11n . Sum of the price is correct but breakup of the price is wrong. Please...
View Articlewhat are the types of planning method in sap any one explain
what are the types of planning method in sap any one explain
View ArticleBAPI_REFSETOFOPERATIONS_CREATE does not commit data to the Database
Hello People, The BAPI 'BAPI_REFSETOFOPERATIONS_CREATE' does not commit the data to the Database even after successful execution with details of the Group Number of the Reference Operation Set....
View ArticleCollective MS04 list
Dear all, I need to create a collective MS07 list, similar to the collective MD04 list made by Mariano Cabalen (Custom Report: MD07 Collective Access with Multiple Selections). I found in Internet the...
View ArticleBatches
Hi, I want to change description of batch characteristic but when I change description it reflect in all earlier batches (Means for all earlier batches the description for that characteristic...
View ArticleBOM creation for trading goods and consumption of child items without any...
Hi! All, We are dealing in trading goods, for which I have defined a BOM, to trigger planning for all the child components (e.g. packing items, warranty cards etc).We are not doing any production...
View ArticleCapacity Utilization - Past report
Hi all, I need a SAP report in which past capacity utilization of the processed production orders can be accessed based on which we can plan the future capacity planning.I have already checked with...
View Article