Alternative qty unit KWH cannot be converted into base unit HR

Dear Experts, Please help me on this issue, a FG with order number 1358513 was confirmed in 07.07.2015. The order quantity was 400 BAG. SD user used 641 movt. type and also 642 in same date that's why...

View Article


Image may be NSFW.
Clik here to view.

Associated reserve requirements is still existed

Hi, Allthe material is goods issue,but in t-code MD04   the demand needs still exist , the error message is "Coverage not provided by master plan".what might reasons for this...? 

View Article


Coverage Profile logic

Hi all, Is there any way to select which MRP elements are used to calculate the average requirement used in the Dynamic Coverage Profile logic?I have an issue with the logic. Say I forecast a flat 6...

View Article

The worklist is empty for these selection options in Backflush

When running the backflush, we receive this error : The worklist is empty for these selection options. Any inputs please? Thanks in advance,.

View Article

CR31 – Create Hierarchy

Dear Gurus, I have 5 work centers for my finished product.  Is it possible to create a hierarchy for them (at the same level) ? I want to use this hierarchy in MF50 in terms of production planning Thanks

View Article


Scrap calculation in Production order

Hi  I have scenario for fixed lot size of 100 and assembly scrap of 200 %. When i create production order with quantity 100 then  scrap amount is not added in  production order quantity, it  remains...

View Article

PR got firmed when check material availability with MDVP

HI, when i run material availability check with MDVP all PRs got firmed. can any one how did do it and how do i remove all firmed indicator in all PRs one time. Tks.

View Article

MRP in collective order

Hi All ,  1. In collective order for child order ( SFG) , MRP is not considering stock produced from another manual order.How to achieve this ? 2. Sale order should trigger Collective order - Which...

View Article


Image may be NSFW.
Clik here to view.

SO Not consuming PIR in strategy 40

Dear Experts                        We are using strategy 40 . Where SO Not consuming  PIR. We maintained following settings .Plz suggest where is wrong ?PIR =100, Stock from PIR - 40, Pending =60SO...

View Article


How to avoid ATP check in Sales order

Dear All,I am working on Scenario of MTS with strategy 40 in Chemical process industry and we have started MRP Run recently.Due to irrespective of demand they have practice to creates Sales orders in...

View Article

Image may be NSFW.
Clik here to view.

PP-PI: Total target qty not shoen in PP-PI order cost analysis

Dear experts, I am searching for the reason why some materials are not shown in PP-PI order cost analysis. I enter PP order ang use Goto / costs / analysis: I guess I missed somthing within material...

View Article

Customising CM25 Layout

Dear experts, I have been playing around with customising CM25 Layout via OPD0, OPG0, OPDJ, CY38 and CY39 by trial and error.I Z-copied Layout SAPSFCLA01 and SAPSFCAS03I Layout key and add a few...

View Article

Co-product & By-product scenario not allow through PI Sheet

Hi Experts, Thanks for your all guidance to SCN. I am new in PI sheet, I need one clarification on that. I try to post the By-product and Co-product through PI Sheet.I completed all related setting for...

View Article


Batch determination during the process order creation

Hi all  !   i need help ! COHVPI to convert planed orders to process order  is taking too much times ( Processing time to convert 4000 planed orders  to process orders is 9700 seconds ). I installed...

View Article

Message no. VBDRV005

While creating receiving condition records in DVR1 for batch derivation I am getting following error  " Message no. VBDRV005" - error found in the selection rule for attribute carbon_content.All...

View Article


how to do sub contranct process in operation wise

Hai, Acually i was search more to get the solution for this, but still i cannot able to find the solution  I can explain the query with example BOM i Created Like this  FERT --------   MMR ---------...

View Article

how to do sub contract process in operation wise

Hai, Acually i was search more to get the solution for this, but still i cannot able to find the solution  I can explain the query with example BOM i Created Like this  FERT --------   MMR ---------...

View Article


cv02n- document status is not editable

Dear experts, configured document status like approver1, approver2, approver3 and approver4 for particular document type. in cv02n i can change status form approver1 to approver2 after sending the...

View Article

PP- Confirmation required in control key

If we choose "Confirmation Required" in control key, then a confirmation has to be done at that operation.  is this true for a milestone confirmation also? (i.e) is a confirmation  mandatory for an...

View Article

how to do subcontracting in operation wise

hai,     If this is my case what to do     Last Four days I am  trying  to resolve this issue  Example : -------------------------------------------------------------------------------------- FERT -...