MRP issue for Spares Material with Reorder point and FX lot size
Hi PP Gurus, I have issue in MRP for Spares Material where no PR's are generated after MRP BG Job run. Client wants to run the MRP via BG Job only and not ready to use MD03 or any Manual...
View ArticleConsumption against process order
hello all gurus,I need to set validation control in process order to consume all the materials based on BOM. There can be a 5% +/ - tolerance on consumption and there should be no major variations on...
View ArticleAutomatic Moving of Expired item to scrap storage location ( 23916 )
hello sap gurus, when i maintaining material shelf life period in Material Master. i Would like to move those FG items which are expired to scrap storage location automatically. i can even schedule a...
View ArticleCOOISPI Report Mismatch
hello sir,requesting to all sap gurus,help me out. COOISPI is not showing all the withdrawn quantity while I am taking the component wise report. If the materials are issued in multiple batches i could...
View ArticleAvailabilty check for the production order
Hi, I have a scenario on the availability check for the components on the production order. It is basically a MTO scenario: Header Material:3011000010 Converting planned order to production order....
View ArticleProduction order creation Issue
hello sirsap gurus,SAP should not allow Planned order to Production order creation if BOM or Rouitng is not present for the material code.
View ArticleMRP RUN no PR created for dependent requirement
Hi. We are actually having some issue on the MRP run for some materials. Everyday MRP is run by a job (see attached details about criteria of MRP run) and converts the requirements created for the...
View ArticlePlanned delivery time is not taken into consideration when creating PR
Good afternoon. I am running an MTS scenario, where i am using EX as lot size and PD as MRP type. When i run MRP for my material,MRP creates one Purchase requisition per day (grouping daily reqs, as it...
View Articlecurrent date scheduling is picking a future date in production order
Hi, When I choose current date scheduling type during production order creation, after scheduling it is adjusted to a future date i.e. If basic start date: 09/09/2015then after scheduling it is...
View ArticleCreate reservation almost expired stock
Initial situationStandard SAP does not take into account the batch level so a shortfall of stock due to expired shelf life will only be detected until the batch actually expires and in that case it...
View ArticleBAPI/LSMW to assign Material components, and update Material qty calculation...
Hi Experts, Please explain ways to assign Material components in recipe, and update Material Quantity calculation in a Recipe on mass level. BAPI/ LSMW which will be better. Do any exist ? Haven't...
View ArticleHow to assign different cost center to a work center with diff validity period
Dear SAP Gurus, I want to assign a new cost center(which got created) for a existing work center effective 01.Jan.2016. I want to have the existing cost center assignment to continue till 31.12.2015....
View ArticleSyntax error were found for Control recipe destination due to BOM change
Dear SAP Gurus, I am getting " Syntax error were found for control recipe destination" while releasing the process order. I have added item 80 as a byproduct in my BOM recently and that has caused...
View Articledisplay 0% load work center in MC38
Dear Expert ; After running my scenario , i checked cm38 for a planner group , every thing is ok except i cant see the work centers with no load ? plz help
View ArticleHow can I manage batck key in process order component?
Hi, when I create a process order I have a material code that has no value in Batch Key field. So when I release for automatic batch determination, the system doesn't check the batch for that...
View ArticleHow to get the scrap percentage for a production order?
Hi SAP Experts Currently we are working on a new Production Order Report We are trying to get the "scrap portion percentage" from a "closed" production order.(The technical name for this is within an...
View ArticleSerial Number Profile and its use.
Hi Team What is the purpose of Serial number profile. br, Kiran U
View ArticleNo entry found/selected for search criteria
Dear SAP Experts, I am facing an issue . We have developed application for production order creation to confirmation. When i start process it shows me errorNo entry found/selected for search criteria...
View ArticleBatch classification issue (screen)
Hello experts, I am facing strange issue. in co15 when i enter order no ( prod order ),then press enter. then i select material, click on components--> batch management--->create batch,then...
View ArticleWhich strategy group use?
Hello.We use strategy groups 10 and 11.For example, when it planning, system take Planned independent requirement, than minus process order (wich was created earlier), afer that it is creating planned...
View Article