Run time abap error

Hi everybody, When I enter MD04 transaction code, after writing the material and plant getting the run time abap error. What would be the reason for this error? Thanks in advance.. Umut RUHI

View Article


routing group counter

Hi, Can we assign common group counter to common routing group.  Say for example if one material code A0001 has routing group as 50000001 with group counter as 1 and other material code A0002 has...

View Article


Mass Component Allocation to Routing Through CEWB

Hi All, I have an scenario where I have hundred of materials where each material header has only one BOM and one routing. The routing only has one operation and I need to massively assign the BOM...

View Article

Split has not been assigned (CM25)

Hello,In CM25 using Profile SAPCFGC005...Order dispatch successfully, But Splits has not been dispatched,PFA screen shot for my issue  Its very Urgent, any one help me with procedure,am doing click...

View Article

Costing variant

Hi all, Need to have clarity on the costing sheet of overhead calculation of finished and semi finished material. And assignment tab in okkn. please help me on this

View Article


MRP Planning File

Hi,When I am running MD01 the purchase requisitions are not created...But when I run MD02 it is working fine... When I checked MD21 for planning file entries... i found that the entries are created but...

View Article

Image may be NSFW.
Clik here to view.

Data extraction for Batch costing...!!!

Hello Experts,I am working on a batch costing project and need your help.I need to do to valuation of every batch for analysis, currently in system i am following below methodTotal Actual Cost = 6916...

View Article

Capacity Requirement using finite scheduling

Dear All, On any work center (labor oriented), if one particular person  is absent on any particular day, System should reflect his absence to the work center. Hence available capacity has to be...

View Article


Query in Master recipe phase relations with type SS and SF

Dear PP experts, I am trying to understand the Master recipe phase relation type SF (Start- Finish) and SS (Start- Start). I have 2 operations / phases in the master recipe Operation 0030- Phase...

View Article


Special stock indicator in sub-con P.O 'E'

Dear Sir, Please can you elaborate how system will trigger special stock 'E' in sub-con P.O. Regards,Pralhad

View Article

User-Exit when creating a Planned Order

Hi all, does anybody know a User-Exit or BAdI for Planned Orders befor BOM will be created?I want to call a FM to put data in the Top-Include of the FM-Group and read this data in the coding of the BOM...

View Article

Image may be NSFW.
Clik here to view.

MRP-Quota splitting

Hi Experts we have maintained Quota arrangement scenario as below Material DetailsMaterial : ROHMRP Type: PDLot size :EX ( Splitting Quota is checked in Config.)Quota arr. usage: 3 Purchase:Vendor-V1...

View Article

Planning strategy 40

Hi, I am testing planning strategy 40 and here is the scenario Avl Stock 200 GALPIR: 300 GALSales Order: 600 GAL When I ran the MRP the system proposed a planned order for 400 GAL and the entire PIR...

View Article


Production Order Scheduling Basic start date in the past

Hi,I have an issue in scheduling the production order in the forward scheduling. the scenario is like this:I am trying to forward schedule the production order starting from today. But when the...

View Article

Planned independed requirment in MD63

We are transferring forecast from APO DP to ECC for next 24 months but in ECC I see PIR only for next 12 months. Is there a way I can see more than 12 months ? Thanks

View Article


Demand Vs CRP Vs Bottleneck Resource

Hi, In finite and infinite scheduling, the system extends the time of planning based on the quantity to be produced. Is this statement is right ? If Yes. If system keeps on extending the time how can...

View Article

Water as a material at 0 cost

Dear experts, For a new manufacturing process, the business requirement is to have water created as a material at cero cost, with QM active (so quality inspections can be created) and to be able to...

View Article


Production BOM change automatic notification to costing team.

Hi, Once i changed the production BOM, How costing team gets automatic notification that BOM has been updated/changed? So that costing team again re-run/re-cost the BOM... Regards,Santhosh.

View Article

Some parts in the BOM are not updating/showing in costing structure BOM...

Hi, Some parts in the BOM are not updating/showing in costing structure BOM eventhough after its ran for costing BOM, please suggest me what i'm missing? Regards,Santhosh.

View Article

activity confirmations are not updated in production CCs

Hi Gurus Problem :  I created a collective production order with automatic goods movements . There are 3 POs including the leading order. I confirmed the all the POs using CO11n . All the goods...

View Article