Run time abap error
Hi everybody, When I enter MD04 transaction code, after writing the material and plant getting the run time abap error. What would be the reason for this error? Thanks in advance.. Umut RUHI
View Articlerouting group counter
Hi, Can we assign common group counter to common routing group. Say for example if one material code A0001 has routing group as 50000001 with group counter as 1 and other material code A0002 has...
View ArticleMass Component Allocation to Routing Through CEWB
Hi All, I have an scenario where I have hundred of materials where each material header has only one BOM and one routing. The routing only has one operation and I need to massively assign the BOM...
View ArticleSplit has not been assigned (CM25)
Hello,In CM25 using Profile SAPCFGC005...Order dispatch successfully, But Splits has not been dispatched,PFA screen shot for my issue Its very Urgent, any one help me with procedure,am doing click...
View ArticleCosting variant
Hi all, Need to have clarity on the costing sheet of overhead calculation of finished and semi finished material. And assignment tab in okkn. please help me on this
View ArticleMRP Planning File
Hi,When I am running MD01 the purchase requisitions are not created...But when I run MD02 it is working fine... When I checked MD21 for planning file entries... i found that the entries are created but...
View ArticleData extraction for Batch costing...!!!
Hello Experts,I am working on a batch costing project and need your help.I need to do to valuation of every batch for analysis, currently in system i am following below methodTotal Actual Cost = 6916...
View ArticleCapacity Requirement using finite scheduling
Dear All, On any work center (labor oriented), if one particular person is absent on any particular day, System should reflect his absence to the work center. Hence available capacity has to be...
View ArticleQuery in Master recipe phase relations with type SS and SF
Dear PP experts, I am trying to understand the Master recipe phase relation type SF (Start- Finish) and SS (Start- Start). I have 2 operations / phases in the master recipe Operation 0030- Phase...
View ArticleSpecial stock indicator in sub-con P.O 'E'
Dear Sir, Please can you elaborate how system will trigger special stock 'E' in sub-con P.O. Regards,Pralhad
View ArticleUser-Exit when creating a Planned Order
Hi all, does anybody know a User-Exit or BAdI for Planned Orders befor BOM will be created?I want to call a FM to put data in the Top-Include of the FM-Group and read this data in the coding of the BOM...
View ArticleMRP-Quota splitting
Hi Experts we have maintained Quota arrangement scenario as below Material DetailsMaterial : ROHMRP Type: PDLot size :EX ( Splitting Quota is checked in Config.)Quota arr. usage: 3 Purchase:Vendor-V1...
View ArticlePlanning strategy 40
Hi, I am testing planning strategy 40 and here is the scenario Avl Stock 200 GALPIR: 300 GALSales Order: 600 GAL When I ran the MRP the system proposed a planned order for 400 GAL and the entire PIR...
View ArticleProduction Order Scheduling Basic start date in the past
Hi,I have an issue in scheduling the production order in the forward scheduling. the scenario is like this:I am trying to forward schedule the production order starting from today. But when the...
View ArticlePlanned independed requirment in MD63
We are transferring forecast from APO DP to ECC for next 24 months but in ECC I see PIR only for next 12 months. Is there a way I can see more than 12 months ? Thanks
View ArticleDemand Vs CRP Vs Bottleneck Resource
Hi, In finite and infinite scheduling, the system extends the time of planning based on the quantity to be produced. Is this statement is right ? If Yes. If system keeps on extending the time how can...
View ArticleWater as a material at 0 cost
Dear experts, For a new manufacturing process, the business requirement is to have water created as a material at cero cost, with QM active (so quality inspections can be created) and to be able to...
View ArticleProduction BOM change automatic notification to costing team.
Hi, Once i changed the production BOM, How costing team gets automatic notification that BOM has been updated/changed? So that costing team again re-run/re-cost the BOM... Regards,Santhosh.
View ArticleSome parts in the BOM are not updating/showing in costing structure BOM...
Hi, Some parts in the BOM are not updating/showing in costing structure BOM eventhough after its ran for costing BOM, please suggest me what i'm missing? Regards,Santhosh.
View Articleactivity confirmations are not updated in production CCs
Hi Gurus Problem : I created a collective production order with automatic goods movements . There are 3 POs including the leading order. I confirmed the all the POs using CO11n . All the goods...
View Article