Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 1841

Reservation with reference BOM

$
0
0

Hi Experts,

 

Can somebody explain how Reservation with reference BOM from MB21 works ? I am trying to create a material reservation which will be reduced in Stock requirements list when a process order with material requirement is created. eg


Material A reservation 1/2/2016 2000 Kg (tcode MB21)


Stock/Requirements List = 2000Kg

 

create process order of product with requirement of 500 Kg of Material A. 4/2/2016

 

I would like the final reservation of Material A to be reduced by 500 Kg so the final reservation of Material A becomes 1500 Kg.

 

Stock/Requirements List = 1500Kg

 

The above is similar with the reduction of VSF when a Sales order is created! Is this possible?

 

Thanks in adnvance


Viewing all articles
Browse latest Browse all 1841


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>